Business Impact Analysis (BIA) and RPO/RTO Determination
Critical business processes, system dependencies, acceptable maximum data loss (RPO) and interruption period (RTO) targets are clarified with business units.
Backup and disaster recovery (DR) consulting is a service that helps organizations determine data loss and interruption tolerances for critical business services, and develop automated backup, replication, business continuity, and crisis recovery strategies.
Having a backup of an infrastructure does not mean that data can be restored seamlessly and within the desired timeframe (restore) in a crisis. Ensuring data security fully requires a comprehensive Disaster Recovery Plan (DRP) that includes not only technology but also human resources, communication channels, service priorities, and architectural dependencies.
The process involves defining target Recovery Point Objective (RPO) and Recovery Time Objective (RTO) metrics with business units. Immutable (unmodifiable) backup architectures against ransomware attacks, geographic replication, disaster recovery access protocols, and operational runbooks are designed. The designed architecture is validated through desk-top scenarios and technical restore exercises.
Critical business processes, system dependencies, acceptable maximum data loss (RPO) and interruption period (RTO) targets are clarified with business units.
Backup, replication, and DR strategies are designed according to the 3-2-1-1-0 backup rule, including on-site, off-site, and immutable (unmodifiable) backup and replication strategies.
The order of service startup, responsible matrix, crisis communication networks, and alternative working methods are documented step-by-step.
Regular data restoration (restore) and disaster scenario exercise results are used to update plans.
Assess the current environment, target and dependencies
Document scope, risks, acceptance and rollback
Implement, validate and document
Backup ensures that raw data is protected and can be accessed backward at a desired point in time. Disaster Recovery (DR) is the business continuity process that covers how and in what order services, databases, and network infrastructure are brought back up after a disaster, and within what timeframe.
No. Depending on the organization's RTO (tolerance for interruption) and budget, a DR environment model can be passive (only backup storage), semi-active (data synchronized), or active (ready to go).
Disaster recovery plans should be tested after critical architectural changes in the infrastructure or applications and at predetermined intervals (at least once or twice a year). More frequent testing is recommended for organizations with critical business loads.
We review your current environment, target and technical requirements in a 20–30 minute call. Scope, assumptions, deliverables and pricing are documented before work begins.
Request an assessment →